Austurhöfn - tónlistarhús

Facts about the building

01_NordurhlidContractors and designers

  • Designed by Henning Larsen Architects and Batteríið.
  • Artist Ólafur Elíasson designed the facade and provided the principle for the overall facade design.
  • IAV hf., Iceland Prime Contractor Ltd., is the principal contractor of the whole project.
  • Acoustics Design by Artec Consultants Inc, New York USA.

Building Strategy

  • Music Hall and Conference centre with meeting facilities.
  • Suitable for a broad range of concerts and cultural events.
  • Flexibility to host big and small events without one interfering with the other.
  • Conference centre with meeting facilities.
  • In-house catering and restaurants.
  • Equipped to highest standards.
  • Exhibitions, promotions and public events.

harpaConference facilities

  • A large conference hall seating up to 750 people
  • Two meeting rooms seating 63 people each
  • Conference services
  • Eight smaller meeting rooms

Key numbers

  • Harpa Concert Hall and Conference Centre is 28.000 square meters (258.000 sq ft) in size.
  • The bottom slab is 8.000 square meters.
  • The building is 43 meters tall (141 ft).
  • 30.000 cubic meters of concrete will be cast in the whole building.
  • The whole building site with adjacent building is 60.000 square meters (15 acres).
  • 2.500 tons of construction steel and 4.000 tons of reinforcement bars will be used in the building.
  • 200.000 cubic meters of soil were removed from the site before construction began.

IMG_6807_webMain consulting companies in the project have been:

  • Henning Larsen Architects
  • Batteríið Architects
  • Olafur Eliasson
  • IPC (IAV)
  • Artec Consultants
  • Ramboll
  • Mannvit Engineers
  • Hnit Consulting Engineers
  • Efla Engineers

Other consulting companies:

  • ASK Architects
  • Almenna Consulting Engineers
  • Verkis Consulting Engineers
  • Verkhönnun Engineers

Artistic adviser

  • Jasper Parrott- International consultant
  • Vladimir Ashkenazy - Artistic adviser